Prefab wall panels · St. Louis, MO
Prefabricated wall panels, built to your drawings
Wall panels, floor cassettes and roof panels, CNC-cut in our St. Louis plant. Order them framed, sheathed or fully closed with insulation, windows, cladding and MEP rough-in. Fixed factory price, a standard 1,000-mile delivery range and shipping anywhere in America by project.

What you can order
Six ways to buy factory framing
Buy single assemblies or a full wall, floor and roof package. Your crew sets, connects and completes the building.
- 01
Subcomponents
Preassembled door legs, headers, stud packs, channels, Els and repeat assemblies.
02Framed wall panels
Open wall frames with coordinated openings and agreed backing.
03Sheathed wall panels
Wall framing plus specified structural sheathing. Added enclosure layers are scoped separately.
04Floor panels
Coordinated floor framing with the selected joist system and decking where specified.
05Roof panels
Roof framing with decking where specified. Remaining roof layers are scoped separately.
06Closed panels
Agreed insulation, enclosure layers, windows, doors, cladding and MEP rough-in.
Approved drawings and the written quote govern inclusions, factory layers and field interfaces.
Packages
Pick the scope. We hold the price.
Framing only
Just the factory framing. CNC-cut subcomponents and open framed wall panels, built to your drawings. Your crew sheathes, closes and finishes on site.
- Subcomponents: door legs, headers, stud packs, channels, Els
- Open framed wall panels with coordinated openings
- Buy only the pieces your crew needs
Sheathed panels
CNC-cut, framed and sheathed wall panels, roof panels and floor cassettes. Your team insulates, closes and finishes on site.
- CNC-cut framing
- Structural sheathing
- Wall panels, roof panels, floor cassettes
Closed panels
Sheathing, WRB, insulation, air barrier, windows, doors, cladding and MEP rough-in are factory-installed to the agreed scope. Your GC leads panel setting and coordinates the follow-on trades.
- Everything in sheathed
- Mineral wool insulation, R-23 walls
- Windows, doors and cladding
- MEP rough-in
- Rothoblaas air and vapor control
The MBS Standard Wall
Seven layers, R-23 above grade
Our standard closed panel: 2×6 framing, mineral wool insulation and Rothoblaas air and vapor control, closed in the factory.
- 1Exterior cladding
- 2Weather-resistive barrier
- 3Structural sheathing
- 4Exterior framing
- 5Cavity insulation
- 6Air and vapor control
- 7Interior gypsum, installed on site

- Effective R-value, above-grade walls
- R-23
- Air leakage on a blower-door test
- < 0.25 ACH50
- Sound rating with site-installed 5/8 in. gypsum
- STC 50+
- Fire rating with site-installed Type X gypsum
- 1 hour
- Wind loads engineered to ASCE 7 and local code
- ASCE 7
- Achieved on a completed MBS home
- HERS 42
Published assembly targets. HERS 42 is a project result, not a rating for every design. Approved drawings govern.
For GCs and framers
Built for crews and schedules
CNC-cut within 1/16 in.
Every member is cut to length from shop drawings that come straight from your BIM model.
Keep your framer
Your crew sets our panels, or MBS installs by agreement. Your GC leads the set and completion.
Standard trucks
Panels ship vertically or flat-packed on flatbed and step-deck trucks. 1,000 miles is our standard range, and we ship anywhere in America by project.
Fixed factory price
Priced from permit-ready drawings, valid 30 days, fixed from contract through delivery.
Plan the job
Put every handoff in the written scope
A starting point for who does what on a panel job. Your project agreement assigns installation, freight, crane work and temporary works.
| Work | MBS and the agreed supply | Your GC and site team |
|---|---|---|
| Drawings and approvals | Reviews the selected supply and the shop drawings | Names the design, permit and field-coordination leads |
| Factory assemblies | Manufactures the quoted products and layers | Confirms the retained materials and interfaces |
| Foundation and site | Provides the project interface information | Arranges site work and foundations unless included |
| Delivery and unloading | Agrees freight, load sequence and handoff | Assigns access, receiving, unloading and racks |
| Lifting and installation | Installs by agreement, or supplies only | Assigns the crane, set crew and installation lead |
| MEP and enclosure joints | Identifies the factory rough-in and closure scope | Assigns field connections, tests and inspections |
| Finishes and closeout | Provides the agreed product and package records | Coordinates finishes and building closeout |
Compare the same completed scope
A factory quote is one part of the installed cost. Put these in both columns when you compare panels with framing on site.
- Factory supply. Products, layers, openings and quoted options
- Site work and foundations. Site preparation, foundation work and utilities
- Materials and trade work. Retained materials, service trades and finishes
- Site assembly labor. Receiving, setting, connections and field completion
- Freight and equipment. Delivery, racks, unloading, crane and access equipment
- Coordination and protection. Temporary work, protection, inspections and closeout
The factory panel price is fixed from contract through delivery for the agreed scope. Estimates are valid for 30 days.
Before the panels arrive
Delivery day goes smoothly when the site is ready for the set.
- Check the foundation layout, elevations, bearing surfaces, anchors and penetrations against the project documents.
- Arrange required inspections, access, crane setup, drainage and the next work area.
- Review the truck route, turning space, overhead limits, unloading position and staging space.
- Name the set crew, crane and installation lead, and confirm the lift plan, bracing and pick points.
- Match the delivery list and assembly marks to the set plan, and record any damage or missing items with photos.
Project documents set the actual tolerances, weights and pick points.
For framers
Start with one real framing job.
Try door legs and headers on one project. Keep your layout, plates and sheathing workflow, then add wall, floor and roof panels when the numbers work.
Bring your foreman to the plant- MBS framing uses 2x6 exterior and 2x4 interior walls.
- The CNC crosscut saw's length stops position to plus or minus 1 mm (about 0.039 in.), under 1/16 in. That is saw positioning, not a finished-panel or field tolerance.
- The CNC subcomponent nailer reads each part by camera and nails it to the set pattern.
- The multi-bridge routes window and door openings and nails sheathing to your project's fastening schedule.
- The adopted code (including the IRC where it applies), engineered drawings, fastener schedules and lift plans govern each job.
What does shipping cost?
Freight is priced into your estimate based on the truck count and distance. Our standard delivery range is 1,000 miles from St. Louis, and we ship anywhere in America based on project size and project pro forma. Send the site address with your plans.
Is the price really fixed?
Yes. The factory panel price is fixed from contract through delivery, regardless of movements in material or labor costs. The scope is set out in your quote.
How energy efficient is the MBS wall?
The MBS Standard Wall is a seven-layer, R-23 above-grade assembly with 2×6 framing, mineral wool insulation and Rothoblaas air and vapor control. Published targets: air leakage under 0.25 ACH50, plus STC 50+ and a one-hour fire rating once 5/8 in. Type X gypsum is installed on site. An MBS home achieved HERS 42. That is a project result, not a rating for every design.
I already have a framer. Can I keep them?
Yes. Keep your crew and have them set our panels. MBS can coordinate installation with your GC, and an installer training program is in development.
What foundation do MBS panels need?
Any conventional foundation your engineer specifies: slab on grade, crawl space or full basement. Your GC pours it while the panels are in production. We size the panels from the survey and the permit set, and the foundation is finished and inspected before the delivery date is locked.
Can you build to our specifications instead of the MBS Standard?
Yes. The MBS Standard Wall is our baseline, not a limit. We build to client specifications based on your project's needs, the quality of materials you want and your build requirements, including builder-grade options. We engineer and price your spec, and the final materials and assemblies are set in your written quote and approved drawings.
Start a project
Send your drawings. Get a fixed panel price.
Permit-ready drawings and a site address are all we need. Your estimate is valid for 30 days, with freight priced in.