Panelized construction guide

What is panelized construction?

Short answer

Panelized construction is conventional wood framing built in a factory. Wall panels and floor cassettes are cut on CNC equipment, closed with insulation, windows, doors, cladding and MEP rough-in, shipped flat on standard trucks and assembled on site in days, not weeks. The result is a stick-built building, not a modular box or a manufactured home.

From our St. Louis line

The multi-bridge running over a sheathed wall panel on the MBS line in St. Louis
Sheathing on the multi-bridge
A sheathed floor panel on the production table at the MBS plant in St. Louis
Floor panels sheathed on the line
Closed wall panels with factory-installed windows standing in the MEP racks at the MBS plant in St. Louis
Windows, siding and MEP at the MEP racks

Side by side

Panelized vs modular vs manufactured vs stick-built

Four ways to put up a home. People often say modular when they mean manufactured, so here is how all four compare on what matters to a developer.

Panelized (MBS)Modular (volumetric)Manufactured (HUD Code)Stick-built on site
What shipsFlat wall panels and floor cassettesFinished 3D room boxesFinished home sections, traditionally on a permanent steel chassisLoose lumber and materials
Where it is framedIn a factory, on CNC equipmentIn a factoryIn a factoryOn the lot, outdoors
TransportStandard flatbed and step-deck trucksOften oversize loads with permits and escortsTraditionally hauled on its own chassisMany material deliveries over weeks or months
Design freedomCut to your drawings, no box sizeLimited by module width and height for shippingFactory floor plans sized to shipAny design
Weather exposureArrives closed. Weather-tight in days, not weeksShort set time, larger craneBuilt indoors, set on siteExposed through framing and dry-in
WasteUp to 90% less; offcuts stay in the plantFactory-managedFactory-managedSite dumpsters
Inspection and financingConventional wood framing to the adopted codeOften state modular program and sealsFederal HUD Code, not local building codes; financed as manufactured housingConventional
Price certaintyFixed factory price at contractFactory price plus oversize transport and craneFactory price plus transport and setupExposed to lumber and labor swings

Modular, manufactured and stick-built columns describe typical industry practice. A 2026 federal law made the manufactured-home steel chassis optional. MBS figures are company-reported; your project schedule and price are set in your estimate.

Cost certainty

The factory panel price is fixed from contract through delivery. Up to 30% lower project cost comes from CNC material planning, fewer weather delays and less waste.

Schedule

Panels are built while the foundation goes in, and closed panels go up weather-tight in days, not weeks. The result is up to a 50% quicker construction schedule.

Less waste

Up to 90% less construction waste. Offcuts are managed in the plant, not thrown in a dumpster on your lot.

Why off-site construction matters

Fewer workers. More homes needed.

Workforce pressure and housing demand make a more predictable production model worth a close look.

Homes short
3.7M
Freddie Mac's estimate of the U.S. housing shortage, in units, as of Q3 2024.
Freddie Mac, November 2024 (opens in a new tab)
Workers needed
349,000
Net new construction workers the industry must attract in 2026, above normal hiring.
Associated Builders and Contractors, January 2026
Average U.S. build
7.4 mo
Start to completion for new single-family homes completed in 2025.
U.S. Census Bureau Survey of Construction, via NAHB (opens in a new tab)
Faster in a modular study
30%
48 modular multifamily projects compared with site-built, with about 5% cost savings. Modular research, not an MBS claim.
U.S. Department of Energy-commissioned study, summarized by NIBS (opens in a new tab)

Industry research describes the projects and populations studied, not a guarantee of project results.

Common questions

Codes, lenders and speed

What is panelized construction?

Panelized construction is conventional wood framing built in a factory. MBS cuts wall panels and floor cassettes on CNC equipment in St. Louis, closes them with insulation, windows, doors, cladding and MEP rough-in, ships them flat on standard trucks and sets them on your foundation. The finished building is stick-built, not a modular box or a manufactured home.

Is MBS a modular builder?

No. Modular builders ship finished 3D boxes. MBS ships flat wall panels and floor cassettes that form a conventional wood-framed building on site. There is no chassis, no HUD-code unit and no volumetric box, and no wide-load transport.

Is a modular home the same as a manufactured home?

No, though many people use the words the same way. Manufactured homes are built to the federal HUD Code, traditionally on a permanent steel chassis used to move them. Modular and panelized buildings are built to the state and local building codes that govern site-built construction, and they sit on permanent foundations. MBS builds panelized: no chassis, no HUD-code unit, no volumetric box.

How fast is it?

MBS delivers up to a 50% quicker construction schedule than traditional construction. Panels are manufactured while your foundation goes in, and closed panels go up weather-tight in days, not weeks. Actual schedules depend on home size, design, project scope, approvals, site readiness, materials, logistics and GC finishing. Your production slot, delivery date and install sequence are confirmed at contract.

Is panelized construction code compliant?

Yes. MBS builds to the codes adopted where the building will stand. Before manufacturing, we confirm with the state or local authority which factory approvals and inspections closed panels need, and use approved third-party inspectors where they are permitted. Site permits and inspections still cover the foundation, installation and completion. In St. Louis, for example, the City inspects panels in our factory and again on site, and every connection stays open to view until interior finishes go on. Some states, Illinois among them, run their own factory-built programs with plan approval, third-party plant inspection and a state seal.

Will a lender treat this as a manufactured home?

No. Fannie Mae's Selling Guide (B2-3-02) says panelized housing "is not considered manufactured housing" and receives "the same treatment as site-built housing." The home must conform to local building codes and sit on a permanent foundation. MBS panels form a conventional wood-framed building with no chassis or HUD-code unit. Use the word panelized with your lender and appraiser, and ask your construction lender early how it funds factory-built components.

Start a project

Two ways to start

Have drawings?

Send your plans. Get a fixed factory price.

Permit-ready drawings and a site address are all we need. Your estimate is valid for 30 days, with freight priced in.

Starting from a lot or an idea?

Talk to our team first.

Our in-house design team can start from a survey and lot dimensions, or from one of our catalog designs.

Or call 314-377-3335 or 1-844-GOPANELS, Monday to Friday, 8:00 AM to 4:30 PM. Want to see the line first? Book a factory tour.