How panelized construction worksFrom drawings to weather-tight in five steps
MBS moves the framing and enclosure work from the lot to our St. Louis plant. Panels are built while your foundation goes in, then set and closed in days, not weeks. The result is up to a 50% quicker construction schedule.
On this page: What panelized means · Five steps · Inside the plant · The Standard Wall · Delivery and install

Panelized construction guide
What is panelized construction?
Panelized construction is conventional wood framing built in a factory. Wall panels and floor cassettes are cut on CNC equipment, closed with insulation, windows, doors, cladding and MEP rough-in, shipped flat on standard trucks and assembled on site in days, not weeks. The result is a stick-built building, not a modular box or a manufactured home.
Panelized (MBS)
Modular
- What ships
- Panelized (MBS): Flat wall panels and floor cassettesModular: Finished 3D room boxes
- Transport
- Panelized (MBS): Standard flatbed and step-deck trucksModular: Often oversize loads with permits and escorts
- Design freedom
- Panelized (MBS): Cut to your drawings, no box sizeModular: Limited by module width and height for shipping
- Inspection and financing
- Panelized (MBS): Conventional wood framing to the adopted codeModular: Often state modular program and seals
The process
Five coordinated steps. One factory price.
Factory production runs while your foundation goes in. That is where the schedule comes from.
- 01
Design
Your drawings or ours
Send permit-ready plans, or let our in-house architectural designer start from a survey and lot dimensions. Every project is modeled in BIM.
- 02
Estimate
Fixed price, valid 30 days
We price your plans and return a fixed factory price, with freight priced in.
- 03
Manufacture
While your foundation goes in
After permit approval, panels are CNC-cut, framed, insulated and closed with windows, doors, cladding and MEP rough-in to the agreed scope.
- 04
Deliver
Standard trucks
Panels ship vertically or flat-packed on standard flatbed and step-deck trucks. No wide loads, no escorts.
- 05
Install
Weather-tight in days, not weeks
Your GC leads panel setting on your foundation, and MBS installation is available by agreement. Interior trades start in a dry, enclosed building.
Your production slot, delivery date and install sequence are confirmed at contract.
Why the schedule is up to 50% quicker
Schematic. Compared with traditional construction. Actual schedules depend on project scope, approvals, site readiness, materials and logistics. Your schedule is confirmed at contract.
Factory · panel manufacturing
Site · foundation, then set and close
Conventional build · one trade after another
MBS panelized build · up to 50% quicker
Inside the plant
One model drives every cut
Your building lives in one BIM model. Assembly drawings and CNC shop drawings come straight from it. More than $2 million in automated CNC equipment cuts within 1/16 in., so what we cut is what you approved.
- 1BIM model
- 2Assembly drawings
- 3CNC shop drawings
- 4Cut and frame
- 5Close, load and ship



Packages
Choosing what to buy?
Framing only, sheathed panels or closed panels side by side, plus single assemblies for your crew.
The MBS Standard Wall
Seven layers, R-23 above grade
Our standard closed-panel package combines 2×6 exterior framing, mineral wool insulation, and Rothoblaas tapes and membranes. An MBS home achieved HERS 42, a project result, not a rating for every design.
Mineral wool is non-combustible, moisture resistant and made with up to 70% recycled content. The Rothoblaas membranes and tapes are Passive House Institute certified and applied in the factory.
We build to your spec
| # | Layer | Specification |
|---|---|---|
| 1 | Exterior cladding | Fiber cement lap siding (James Hardie), LP SmartSide or your specified finish |
| 2 | Weather-resistive barrier | Fluid-applied WRB, ZIP System or house wrap, per design |
| 3 | Structural sheathing | 7/16 in. OSB or 19/32 in. plywood |
| 4 | Exterior framing | 2×6 kiln-dried SPF, 16 in. on center, CNC-cut |
| 5 | Cavity insulation | Mineral wool, full cavity, installed in the factory |
| 6 | Air and vapor control | Rothoblaas membranes and tapes |
| 7 | Interior gypsum, installed on site | 5/8 in. Type X, installed on site by others, not in the MBS package |
Assembly performance targets
- R-23
- Effective R-value, above-grade walls
- < 0.25 ACH50
- Air leakage on a blower-door test
- STC 50+
- Sound rating with site-installed 5/8 in. gypsum
- 1 hour
- Fire rating with site-installed Type X gypsum
- ASCE 7
- Wind loads engineered to ASCE 7 and local code
- HERS 42
- Achieved on a completed MBS home
Published MBS assembly targets. Specifics change with climate zone, code and design, so treat them as typical. Fire and sound ratings assume 5/8 in. Type X gypsum installed on site by others. Your drawings and written quote govern.
Built to your specifications
The MBS Standard is our baseline, not a limit.
We build to client specifications. Tell us what the project needs and we engineer, price and build it on the same CNC line.
Send us your specs- Your needsThe design, use and site conditions of your project.
- Your materialsThe quality level and products you specify, including builder-grade options.
- Your build requirementsEnergy, fire, acoustic and code targets set by your project, lender or program.
Final materials and assemblies are set in your written quote and approved drawings.
Delivery and install
Standard trucks. Weather-tight in days, not weeks.
- Ships flat or verticalRacked upright on A-frames or flat-packed on standard flatbed and step-deck trucks. Loads stay within legal limits, 8 ft 6 in. wide and 13 ft 6 in. high, so there are no wide-load permits and no escorts.
- 1,000-mile standard rangeAcross the Midwest, Mid-South and Plains, and we ship anywhere in America based on project size and project pro forma. Freight is priced in your estimate.
- GC-led setYour GC leads the set with your framer, and MBS installation is available by agreement. An installer program for GCs is in development.
- Inspected as conventional framingBuilt to the codes adopted where the building stands. We confirm the factory approvals and inspections with the state or local authority before manufacturing, and site permits cover the foundation, installation and completion. In St. Louis the City inspects panels in our factory and again on site, and every connection stays open to view until interior finishes go on. Your foundation is completed to MBS tolerances before delivery.
Start a project
Two ways to start
Have drawings?
Send your plans. Get a fixed factory price.
Permit-ready drawings and a site address are all we need. Your estimate is valid for 30 days, with freight priced in.
Starting from a lot or an idea?
Talk to our team first.
Our in-house design team can start from a survey and lot dimensions, or from one of our catalog designs.
Or call 314-377-3335 or 1-844-GOPANELS, Monday to Friday, 8:00 AM to 4:30 PM. Want to see the line first? Book a factory tour.